Spacing of intermediate gullies - For a large concrete car park

Foul and surface water, private drains and public sewers, land drains and soakaways, filter drains and any other ways of getting rid of water.
Post Reply
shix
Posts: 1
Joined: Mon Feb 06, 2006 12:41 pm
Location: Staffs

Post: # 10874Post shix

Hi, wondering if I could get a little advice;

I have a large multi-storey car park which requires drainage at top level. The slab is only 150mm deep and therefor I think too shallow for linear drainage.

The cross fall is 1:60, meeting to create a drainage channel, but there is no longitudinal fall. How do I go about calculating the spacing needed for intermediate gullies?

Many thanks.

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 10898Post Tony McC

How will you get gullies into a 150mm deep slab?

Do yu know there are shallow linear channels known as Deck Drains that have been developed for exactly this type of problem?

Your discharge capacity is critical - you need to know that, along with the collection capacity of any gullies or linear channels, befire you can work out how many are needed and where they ought to be positioned.
Site Agent - Pavingexpert

rjgardner
Posts: 4
Joined: Wed Mar 15, 2006 2:46 pm
Location: The Midlands

Post: # 11185Post rjgardner

Probably a bit late but a useful document would be the 'Design Manual for Roads and Bridges part 3 HA 102/00 Spacing of Road Gullies'

Alternatively, as a rule of thumb we use 150-200 sqm as a maximum area draining to a single gully.

Hope this helps

rjgardner
Coming soon!

Soakaway ver 2.0

Design Suds Devices to BRE365 or Ciria R156

Includes:
Design tools for Trench/Pit/Ring/Blanket/Permeable Pavement Infiltration devices and Attenuation tanks.
Construction Details.
Customisable Reports.

Enquiries:
Email: soakaway@rgapplications.co.uk

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 11201Post Tony McC

But we still don't know how they are going to get a gully into a 150mm thick slab - linear channel is the only solution that's viable!
Site Agent - Pavingexpert

Post Reply