Hi All
First post after reading a lot of the website.. I have a question that maybe someone can advise me on.
I'm in the process of laying a new patio and have a query around my sub base. The Edge of the Patio will have a step down onto the grass of around 6- 8" .. As my patio will consist of a circle kit, which forms part of the edge and will contain some curves finished of with a sett to edge.. How do I build my subbase if I don't have a permanent edge to start of with (if was a straight end that would be easy) do I just extend my subbase past the point of the patio and cut in, once I've layed my circle kit.. as the circle kit may require some adjustment when being laid, so a boarder cannot be laid first and then infilled with Type1. Any advice would be welcomed. Thanks, Shaun.
First post after reading a lot of the website.. I have a question that maybe someone can advise me on.
I'm in the process of laying a new patio and have a query around my sub base. The Edge of the Patio will have a step down onto the grass of around 6- 8" .. As my patio will consist of a circle kit, which forms part of the edge and will contain some curves finished of with a sett to edge.. How do I build my subbase if I don't have a permanent edge to start of with (if was a straight end that would be easy) do I just extend my subbase past the point of the patio and cut in, once I've layed my circle kit.. as the circle kit may require some adjustment when being laid, so a boarder cannot be laid first and then infilled with Type1. Any advice would be welcomed. Thanks, Shaun.
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Posts: 4
- Joined: Wed Oct 26, 2016 1:27 pm
- Location: Sutton, Surrey
Don't want to raise the ground, that's too much work.. Probably need to work out the exact perimeter and build a retaining wall to the height of the subbase.. I was hoping to get the sub base laid before the slabs/circle kit turned up.... but it all depends on the position of the circle kit.
Might be easy to wait for this to turn up, then dry lay the circle kit and work out perimeter/edge and build a small retaining wall afterwards. Or, thinking about it - I could build a rectangle and fill with MOT and then extend the sub base for my curves etc once the kit has arrived (so that 90% of the base is then completed ) As it's more or less a 4m x 10 rectangle.. I think I might have found a solution, by sharing the issue.. I can use my old patio slabs as a retainer, sunk into the ground to create my perimeter..
Thanks,
Shaun.
Might be easy to wait for this to turn up, then dry lay the circle kit and work out perimeter/edge and build a small retaining wall afterwards. Or, thinking about it - I could build a rectangle and fill with MOT and then extend the sub base for my curves etc once the kit has arrived (so that 90% of the base is then completed ) As it's more or less a 4m x 10 rectangle.. I think I might have found a solution, by sharing the issue.. I can use my old patio slabs as a retainer, sunk into the ground to create my perimeter..
Thanks,
Shaun.
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Posts: 4
- Joined: Wed Oct 26, 2016 1:27 pm
- Location: Sutton, Surrey
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
Seems a cack handed way of doing it to me, temporary works is time consuming and costly. Why don't you make a trammel from circle centre to edge and build the wall to the correct dimensions alliwing for a 20/30 ml over hang at wall edge. That way your only building one boundary and less chance of differential settlement.