Hi All,
I've tried to read all the threads but I'm now even more confussed.
I have 100m2 of sandstone thats just been laid, its our rear patio so no heavy vehicles. I'm trying to decide on the best way to point it.
I've looked at Easy Joint and GFTK800 but when doing the calculations I believe I'm looking at:
Sandstone size: 900x600, 600x600, 600x290 &290x290.
Gap about 15mm, Depth about 20mm
Easy Joint around 4 tubs £120ish
GFTK800 nearer 10 tubs and £850ish
Am I correct? Any help apreciated.
Joe
Sandstone pointing suggestions
-
- Posts: 2504
- Joined: Thu Jul 10, 2003 10:20 pm
- Location: hemel hempstead,herts. 01442 212315
nope you are way off the mark
4 tubs?? 15mm is more of a gap than needed, but 6sqm per tub, 16 min tubs@£25 plus vat approx, £480
cannot comment on the other stuff as i have never used it
4 tubs?? 15mm is more of a gap than needed, but 6sqm per tub, 16 min tubs@£25 plus vat approx, £480
cannot comment on the other stuff as i have never used it
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 3
- Joined: Fri Sep 30, 2016 2:38 pm
- Location: uk
Hi All,
Realised that the online calculator asks for slab sizes in CM not MM so think I just confused the calculator! Its more like 20 tubs.
I agree sand and cement may just be the best option. If the only benefit to these premixes the labour time?
Someone said to me that using cement will always crack as it has no flexibility??? Is that correct?
Realised that the online calculator asks for slab sizes in CM not MM so think I just confused the calculator! Its more like 20 tubs.
I agree sand and cement may just be the best option. If the only benefit to these premixes the labour time?
Someone said to me that using cement will always crack as it has no flexibility??? Is that correct?
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 3
- Joined: Fri Sep 30, 2016 2:38 pm
- Location: uk
Thanks LutonLargerLout, I'm actually less than 5 miles form Luton!lutonlagerlout wrote:sometimes it does,sometimes not
the 2 part resin mortars are excellent but can cost as much as the flags!
sand and cement pointing is best down around spring or autumn ,too much heat causes shrinkage
LLL
I think with the size and dept of the gaps, plus the fact its 100m2 its more cost effective to go the old fasion route.
Thanks everyone.
-
- Posts: 66
- Joined: Mon Sep 14, 2015 11:41 am
- Location: Ipswich, United Kingdom
I suspect you've pointed it by now?Jsmale wrote:Hi All,
Realised that the online calculator asks for slab sizes in CM not MM so think I just confused the calculator! Its more like 20 tubs.
I agree sand and cement may just be the best option. If the only benefit to these premixes the labour time?
Someone said to me that using cement will always crack as it has no flexibility??? Is that correct?
Labour time is the main saver and of course the fact you can apply it even if raining, something you certainly can't do with cement
You give your back and knees a rest not having to work it into the joints, this adds up if you're doing this regularly
EASYJoint video
There's an unlimited shelf life with EASYJoint (when unopened), any unused product you do have can be reused provided it is returned to the tub and submerged by at least 50mm of water and resealed.