wouldnt say its harder to install the blocks are larger than standard paviours
when you say premium to install do you mean an extra £30 or so a m2 more than standard paviours to install? as the metros are near enough £40 a squared meter just to buy so more than 3 times the price of standard blocks
when you say premium to install do you mean an extra £30 or so a m2 more than standard paviours to install? as the metros are near enough £40 a squared meter just to buy so more than 3 times the price of standard blocks
-
- Posts: 8
- Joined: Wed Sep 28, 2016 9:15 pm
- Location: london
-
- Posts: 791
- Joined: Wed Feb 05, 2014 7:50 pm
- Location: leicester
-
- Posts: 8
- Joined: Wed Sep 28, 2016 9:15 pm
- Location: london
I have been quoted £19000 inc building a 9.5sqmeter wall around the drive with marshlite and 9m of argent coping with some lighting in walls, also includes digging out and lowering of a drain changing position of manhole. Replaceing all sewer and surface water drain pipes etc and new aco drain. This installer prefers a concrete base with suitable drainage. I also need to get rid of 10 conifers and get the stumps ground.
Does this sound too high. He reckons 5 grab trucks of muck to be removed. I did receive one quote for £22500 and another for a crazy £27000. Seems round here skys the limit with pricing.
Does this sound too high. He reckons 5 grab trucks of muck to be removed. I did receive one quote for £22500 and another for a crazy £27000. Seems round here skys the limit with pricing.
-
- Posts: 1071
- Joined: Sat Aug 22, 2009 8:57 pm
- Location: essex
-
- Posts: 394
- Joined: Thu Jan 05, 2012 11:41 am
- Location: northampton
Too far from me but youd need more detail to get rough idea of price best thing you can do is get a couple more quotes as it seems like a fairly involved job rather than a straight forward drive
115m2 at a minimum dig of 260mm youd need 4 grabs but it depends on levels
replacement/moving of manhole is technically bco territory although if its a repair it ok
personally never laid on a concrete base (Im minimum of 150mm type 1 on drive) but like everything else if the concrete base is not thick enough or on a suitable subbase it wont last
115m2 at a minimum dig of 260mm youd need 4 grabs but it depends on levels
replacement/moving of manhole is technically bco territory although if its a repair it ok
personally never laid on a concrete base (Im minimum of 150mm type 1 on drive) but like everything else if the concrete base is not thick enough or on a suitable subbase it wont last
-
- Posts: 8
- Joined: Wed Sep 28, 2016 9:15 pm
- Location: london
Thanks I had yet another quote for £25000 using type 1 so it seems the ball park. I have a friend who has a reinforced concrete driveway base sounds he tells me that it consists of 200mm c30 reinforced concrete slab with 150mm type 1 and has sand and blocks. He has had it down for 12 years now without any issues. Sounds overkill to me not sure if its a bright idea or not but hes happy with it.
-
- Posts: 791
- Joined: Wed Feb 05, 2014 7:50 pm
- Location: leicester
-
- Posts: 8
- Joined: Wed Sep 28, 2016 9:15 pm
- Location: london
-
- Posts: 791
- Joined: Wed Feb 05, 2014 7:50 pm
- Location: leicester
Following our telephone conversation earlier today, if you have heavy vehicles on the paving a 150mm sub base will not be sufficient.
So a concrete capping layer and 150mm - 225mm base or a much deeper sub base if no capping layer is installed, usually 500mm.
You will also need to use 80mm blocks regardless of weather they are driveline metro or not.
Good luck.
So a concrete capping layer and 150mm - 225mm base or a much deeper sub base if no capping layer is installed, usually 500mm.
You will also need to use 80mm blocks regardless of weather they are driveline metro or not.
Good luck.
-
- Posts: 712
- Joined: Sat Oct 19, 2013 7:56 am
- Location: South Wales
- Contact:
-
- Posts: 8
- Joined: Wed Sep 28, 2016 9:15 pm
- Location: london
lemoncurd1702 wrote:What are the heavy vehicles, vans, lorries or 4x4?
I've had no issues with my laden 3.5T parked on my drive of 50mm tegs on around 150mm base.
Sounds crazy but quite often 20 to 30 ton vehicles of course not every day but a few times a month. I like the idea of the driveline metro or stone market vecta (same block different name) as they are 80mm and quite attractive.