problem for me is I lay al my patios on around 40-70mm of 5:1 grit sand cement +SBR on a full bed
no way on gods earth is that going to be freedraining
water drains to the falls that I incorporate
LLL
6/1 MIX is not permeable, who told you that azpects, as LLL said. laid on a solid be with fall water will not run through the patio, where in the marshalls instruction for weather point does it say free drain laying course for weather point to cure the wetter the better and can be used in rain ,
with a wet bed that dont happen. MSH
azpects,
your calculator is telling me i only need 1 tub for a 30sqm 900x600 flags with a joint 25mm deep and 10mm wide.
That can't be right when the tub is only 12.5kg!? :rock:
when i look at other brands coverage i estimate i need at least 2 perhaps 3 x 25kg tubs...
I agree with Tony and msh. A wet 6 to 1 mix is not going to be permiable.
Was the weatherpoint compacted in to the joints properly or just brushed in and left?
There is no way the underside of the joint will stay damp indefinitely even with no fall.
luzippu wrote:azpects,
your calculator is telling me i only need 1 tub for a 30sqm 900x600 flags with a joint 25mm deep and 10mm wide.
That can't be right when the tub is only 12.5kg!? :rock:
when i look at other brands coverage i estimate i need at least 2 perhaps 3 x 25kg tubs...
I'm getting 4 tubs with the same measurements, I don't know what has gone wrong there?