Dream job just came in

General banter, tradesmen, recommendations and warnings, surplus materials, humour and owt else!
Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 110960Post Forestboy1978

Who am I though mmmwhahaha

If you figure it out you can probably go higher cos I don't think 20% is enough...

and good luck to you if you can do it for less

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 110961Post dig dug dan

Crack on. Anyone else will struggle without somewhere to tip the soil, so I think your price reflects this
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

rab1
Posts: 1869
Joined: Sun Jun 07, 2009 10:19 pm
Location: scotland

Post: # 110963Post rab1

make sure you are specific in what you will do and you are including in your quote, the exclusions are really important
God loves a tryer

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 110964Post Forestboy1978

still working on it.. price is going up...

Factoring in rest areas it's 160m2 ish

70+ trips to the recycling centre with spoil

90 - 100 back with limestone. Obv want to do a return trip with limestone where possible but it wont always be possible.. jesus (excuse pun)

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 110970Post GB_Groundworks

There has to be an easier way than 150 transit runs pm me the address etc so we can have a look at google maps etc
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 110973Post Dave_L

Big is not always beautiful, remember that and you won't go far wrong.

It's easy to get carried away wanting the bigger jobs but you've got to look at what you can do/make with smaller jobs and a whole lot less risk and hassle.
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 110974Post Forestboy1978

How much cheaper to get concrete pumped in you reckon. Look shit but....

I can't see it being much cheaper as most of this is disposal costs.

I understand what you're saying Dave but this job WILL get me those small jobs. It's also 6 week work for us and if i price it right it wont be 6 weeks of squeaky bum time..

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 110975Post Dave_L

Get a price from a local contractor for bitmac surfacing. Make sure it is a hardstone 6mm surface course. Pumped concrete will be a pain!
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 110977Post Forestboy1978

Damn this is big....

Still working on it. I better get it. There's so much more to it than a 10x15 patio

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 110978Post Forestboy1978

finally hit the enter button. I had a look at the site today and found somewhere. I've stipulated that the quote is based on storage of spoil in that location and it will require the reduction of 2 bay trees.

Still went high on it. It's complicated and full of logistical problems.

We'll see....

rxbren
Posts: 394
Joined: Thu Jan 05, 2012 11:41 am
Location: northampton

Post: # 111000Post rxbren

For the stone you could always just get a load dropped on the road then spend a few hours shifting 20t with the difference and dumper it's not ideal but it works

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 111009Post Forestboy1978

rxbren wrote:For the stone you could always just get a load dropped on the road then spend a few hours shifting 20t with the difference and dumper it's not ideal but it works
Can I? But where to shift to? I'm speaking to them tomorrow to see if it can be grabbed out of the truck and positioned exactly where I want it. If not, yeah, that'll have to do.

rxbren
Posts: 394
Joined: Thu Jan 05, 2012 11:41 am
Location: northampton

Post: # 111018Post rxbren

You'd have to get enough dug out to fill directly with stone at least you will only be shifting it once

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 111061Post Forestboy1978

Still no reply......

Doubt I'll get it. 10 hours I spent thinking about it.. sigh

Thanks for all the support btw

DNgroundworks
Posts: 1951
Joined: Sat Dec 06, 2008 10:28 pm
Location: Preston, Lancashire

Post: # 111062Post DNgroundworks

It'll be do-able, just depends on budget. Im just finishing a 45k job with very limited access, everything has come in and out with a 4 wheel grab.

And I've done it on my own :p

Sounds like an interesting job, are there no neighbours with a decent sized garden? Would they be willing to rent your their lawn for use a depot whilst you do the work and put it all back to how it was when done?

Did you say you have a drive you could use as a depot? if its not a new driveway id be tempted to use it and grab the spoil away from there and grab your hardcore onto your drive and dumper it to site a 1 tonne high tip..thats how I've been doing this one, its no perfect i suppose, depends on how busy the street is.....but may be your best bet?

Post Reply