Dream job just came in

General banter, tradesmen, recommendations and warnings, surplus materials, humour and owt else!
Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 110590Post Forestboy1978

Hi guys basically had a call from the local church. 50 yards from my house and they want somewhere in the region of 150- 200m2 of wheel chair access paths fitted.

Job can be done when I want too.

This job will take my biz to the next level as I'll get tons of more work out of it and it in itself is a big job. I'm going to give them a variety of quotes for different types of paving and concreting but obviously I want this job. Being so big and so close I can go lower on the prices than I normally would perhaps but grab trucks aren't looking like an option so don't know how low I can go really. Obviously it's big so I don't want to go too low and find myself regretting it.

Going back on the weekend to take measurements etc.

Any advice would be greatly appreciated.

Ta

rxbren
Posts: 394
Joined: Thu Jan 05, 2012 11:41 am
Location: northampton

Post: # 110591Post rxbren

Don't lower your prices on the basis of more future work. price as you usually would being close is just a bonus make sure your public liability covers it and allow for fencing stuff off from straying public.
They will literally want what's cheapest so dont spend too much time on lots o versions they will more than likely want basic 600x600 slabs and possibly the ribbed ones for the slopes.
Will you have to do handrails as well

digerjones
Posts: 889
Joined: Fri Jan 18, 2008 9:32 pm
Location: cheshire

Post: # 110594Post digerjones

Yes don't lower your prices. I did the steps on my local church.
One thing is does is people see the church trusting you, so Joe public are seeing you as a trusted professional. Weather you get any work from it is another story, it won't do you any harm.
dylan

digerjones
Posts: 889
Joined: Fri Jan 18, 2008 9:32 pm
Location: cheshire

Post: # 110595Post digerjones

dylan

michaelthegardener
Posts: 638
Joined: Sat Jul 17, 2010 8:20 am
Location: bristol

Post: # 110600Post michaelthegardener

yeah don't lower your prices I missed out on some work this year because I didn't and don't regret it one bit it would have been regular grass cutting but I wanted to much for the first cut being as it was may and it was 3 foot high :p someone else got the first cut and did it so badly I declined the contract anyway :rock:

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 110604Post lutonlagerlout

bar faced slabs are de rigeur for wheelchair and disabled access,be aware lots of regulation regarding up stands,falls and resting areas

dont go low

LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 110616Post Tony McC

Get a copy of Document M from the Building Regs.

Lots of churches, scout huts, village halls, etc., assume a wheelchair access will be a piece of pi....err...cake because they've not familiarised themselves with just what's required to meet the regulations. They are NOT cheap to do properly.

Don't go in cheap in the hope that it might, possibly, one day, perhaps, maybe, lead to more work.

And if you do get the job, make sure your company name is everywhere!
Site Agent - Pavingexpert

sy76uk
Posts: 791
Joined: Wed Feb 05, 2014 7:50 pm
Location: leicester

Post: # 110651Post sy76uk

What are your strengths forest?
For me, I can lay block paving a lot quicker than anything else so i'd be steering them towards that option, for you it maybe slabs.
Work out a way you can do a good job for the church that plays to your strengths and when pricing make sure you add enough to your best case quote to cover any hiccups or lost time.
200m2 isn't much in an open area but for disabled paths it's more than likely going to be fiddly.
Good luck.

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 110655Post Forestboy1978

Cheers for the advice guys.

Tony I have downloaded that document and will be looking it over tomorrow. Thanks

Sy I've never done block paving in my life so er no I'll stick to laying slabs. Re block paving, I'd like to familiarise myself with it but on my own terms. Once I get the opportunity to lay some for myself I'll do the most complicated design possible at my leisure to get the knack.

Ta

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 110661Post seanandruby

If you have the know how to lay flags then you have the knowledge for block paving, the blocks are just smalller element paving. You must lose a lot of work through it?
sean

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 110664Post Forestboy1978

seanandruby wrote:If you have the know how to lay flags then you have the knowledge for block paving, the blocks are just smalller element paving. You must lose a lot of work through it?
Yes Sean it does lose me a lot of business but I've had it with doing things first time for customers. It puts my stress levels through the roof.

I'll do it for a friend or myself one day where I can play about and not have a schedule to keep before I do it cold for someone who can review me.

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 110674Post seanandruby

Fair nuff Forest but i have faith in you :;):
sean

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 110696Post Forestboy1978

Thanks Sean :-)

Forestboy1978
Posts: 1000
Joined: Sun Oct 23, 2011 9:57 am
Location: southampton, hampshire

Post: # 110831Post Forestboy1978

OK this has really hit it home to me that I need some sort of pricing structure. I always calculate expenses and estimate the length of the job and work out the quote based on that.

I just can't work this in that way. This one I just have zero idea how long it'll take. May decline it...

GB_Groundworks
Site Admin
Posts: 4420
Joined: Sat Aug 09, 2008 3:55 pm
Location: high peak
Contact:

Post: # 110832Post GB_Groundworks

assumptions 3 man team 2 machine men tradesmen 1 labourer good access a place for materials and a place for muck away all within 200mm


1.5 ton mini digger and 1 ton dumper

150m of path

day 1 arrive on site fence up delivery machines mark out paths, rest areas, cat scan,
2 dig off soil and cart to muck pile
3 lay 100mm mot and consolidate
4 edgers (assumed 1.5m3 dry mix delivered each morning)
5 edgers
6 edgers


now i don't know if its steep or flat

so id lay asphalt paths if its flat or id do brushed concrete on the steep parts

now you could sub in an asphalt firm to lay onto if your mot say £25/m2 pavement spec

if it needs hand rails then key clamp scaffold bars and clamps concreted in works out material cost £32/m then fitting so say £46/m

extra day to soil up and turf/seed to edgers
day to clear site tidy up

11,300

so id be thinking somewhere around 16,000 - 18,000 + vat for flat asphalt paths


or if using slabs set edgers then screed and lay on screed at 1200mm wide butt jointed but slower way to go




Edited By GB_Groundworks on 1471176913
Giles

Groundworks and Equestrian specialists, prestige new builds and sports pitches. High Peak, Cheshire, South Yorkshire area.

http://www.gbgroundworks.com

Post Reply