Filling in pond

Other groundworks tasks, such as roads and footpaths, terracing, fencing, foundations, walls and brickwork, tools and plant.
Post Reply
Squeakers09
Posts: 1
Joined: Sat Jul 16, 2016 12:14 am
Location: Margate, UK

Post: # 110134Post Squeakers09

Hi, we currently have a pond (7ft L X 5ft W X 4ft D), which we wish to fill in, then pave over with Concrete Flags on a sand/grit bed with sand jointing, which we want to put two sheds on top of.

I'm just wondering what is the best way to fill the hole, without the ground subsiding.

What layers/materials would we need and how deep?
What layers would want compacting?
How can we tell if the ground has compacted enough?
Would we need to leave the ground for an amount of time before paving?

We are looking at hiring a compactor from hire station
which one would be best for this job (if needed)?
https://www.hirestation.co.uk/tool-hi....paction

Thanks in advance.
--
Squeakers09

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 110146Post seanandruby

I'd use a geo grid, then a good quality crush and run up to capping level. Place a good quality terran, start your formation with 150 dpt1, then your bedding layer and finally your slabs. Make sure you compact in layers as you progress.
sean

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 110154Post Dave_L

Surely the initial fill could be with subsoil then the construction buildup?
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 110159Post seanandruby

Dave_L wrote:Surely the initial fill could be with subsoil then the construction buildup?
Where and why would you buy sub soil ??? It is an old pond so think water, mud etc: I've used dry lean before.
sean

Dave_L
Site Admin
Posts: 4732
Joined: Fri Jul 28, 2006 8:47 pm
Location: Somerset
Contact:

Post: # 110162Post Dave_L

OP could come and fetch as much as he likes from my yard! :) :)
RW Gale Ltd - Civils & Surfacing Contractors based in Somerset

See what we get up to Our Facebook page

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 110216Post Tony McC

It's a matter of how you compact the sub-soil. If you've a 20+ tonne machine to belt oit down with the bucket and then track over it repeatedly, then maybe, but with such a small (relatively speaking) area, it's more likely a plate compactor would be used, so better to build up in layers of, say, crusher run with geo-textile interleaves to minimise/eliminate any future settlement.
Site Agent - Pavingexpert

Post Reply