Hi guys
I am about do start digging out for a new patio area about 60m2, I have lifted all the badly laid slabs, There is an area about 15m2 where the slabs are solid and there is no movement from them, Can i leave these down an dig around them, fill with hardcore and slab over the top of them? Or would it be best to lift the lot and start fresh? Thanks