Laying block paving over clay

All forms of block paving, brick paving, flexible or rigid, concrete or clays, new construction or renovation
Mikecb1
Posts: 7
Joined: Wed Mar 16, 2016 9:03 am
Location: Southampton

Post: # 108284Post Mikecb1

I am planning to replace my 150 sq metre shingle drive with block paving. I will be using Marshalls Tegula blocks. The underlying soil in my location is clay, but I have not excavated the existing shingle drive to see exactly what is underneath. It appears to be some kind of compacted hardcore. I have obtained quotes for the new drive from 3 Marshalls registered installers, but because of the clay I've had 3 different opinions on the required sub base. One guy says geotextile membrane, 2 x 75mm layers of compacted mot1 aggregate and 40mm sand. Second chap says first put down a 40mm layer of weak mix concrete, then the other layers. Third guy says no membrane, 75 mm premix concrete, 75mm mot1, 40mm sand. I contacted Marshalls for advice, but they say it's best to rely on the experience of local installers, and wouldn't make any recommendation.

I would be very grateful for some advice.

TIA

Mike
Docmike

dig dug dan
Posts: 2504
Joined: Thu Jul 10, 2003 10:20 pm
Location: hemel hempstead,herts. 01442 212315

Post: # 108286Post dig dug dan

The first option is the best. The geotextile is designed to stop the sub base mixing in with the subgrade. We have similar soil conditions here, and I have never had problems.
Dan the Crusher Man
01442 212315
www.crusherhire.co.uk
"a satisfied customer? we should have them stuffed!"

Mikecb1
Posts: 7
Joined: Wed Mar 16, 2016 9:03 am
Location: Southampton

Post: # 108288Post Mikecb1

Dan

Thanks for the advice. The fact that two out of three of the prospective contractors were adamant that a layer of concrete was needed on top of the clay bothered me. When you're laying out 20 grand you want to be sure it's going to be done right!

Mike
Docmike

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 108291Post lutonlagerlout

in fairness all are right in different ways
I have seen lads use lean mix where the sub grade is bad and it lasts the test of time
technically geo membrane and 2 layers of 75mm type 1 wacked is correct , but the others will probably work too
cheers LLL :)
"what,you want paying today??"

YOUR TEXT GOES HERE

Mikecb1
Posts: 7
Joined: Wed Mar 16, 2016 9:03 am
Location: Southampton

Post: # 108299Post Mikecb1

Thanks LLL. I can sort of understand how lean mix could stabilise the underlying clay, but would a 75mm slab of premix also be satisfactory? I wonder if it might crack if the underlying clays moves, and if it would lead to drainage problems?
Docmike

lemoncurd1702
Posts: 712
Joined: Sat Oct 19, 2013 7:56 am
Location: South Wales
Contact:

Post: # 108306Post lemoncurd1702

Geo-text and possibly a geo-grid which is a plasticy reinforcing mesh sitting between the layers of sub-base giving it tensile strength similar to how reinforced concrete works but naturally retaining flexibility and drainage properties.
Haven't tried it myself yet but it is increasingly common on civil projects.

Maybe Sean could enlighten further.

I have however used cement dusted over top of first layer prior to topping with second layer to stabilise the base material in wet conditions. Helps dry it out and stiffen up a bit without compromising the permeability too much.
Cheers
Lemoncurd

Mikecb1
Posts: 7
Joined: Wed Mar 16, 2016 9:03 am
Location: Southampton

Post: # 108313Post Mikecb1

Thanks lemoncurd

The geogrid sounds like a good idea, as does adding some cement to the first layer of aggregate, though none of the people who have quoted suggested either of these. Closest was the chap who wanted to put down a layer of lean mix first. As I said a couple of posts back, the proposal that bothered me most was putting down a 75mm concrete slab first, followed by a single 75mm layer of aggregate. Seemed to me to be likely to crack and/or create drainage problems.
Docmike

lutonlagerlout
Site Admin
Posts: 15184
Joined: Fri Aug 04, 2006 12:20 am
Location: bedfordshire

Post: # 108316Post lutonlagerlout

its not a slab per se ,its just very dry leanmix
I know of 2 blokes who use this technique when the underlying ground is very poor ,and it works for them
I also know for a fact that it is specified on some civil projects,right or wrong
LLL
"what,you want paying today??"

YOUR TEXT GOES HERE

Mikecb1
Posts: 7
Joined: Wed Mar 16, 2016 9:03 am
Location: Southampton

Post: # 108320Post Mikecb1

LLL

Thanks. Yes, the lean mix approach seems favourite from what everyone has said, unless, after excavation, the sub-soil turns out to be reasonably firm. In this case the lean mix may not be needed.

What no-one has commented on explicitly was the proposal to put down a slab of pre-mix instead of the first layer of aggregate.
Docmike

mickg
Posts: 2598
Joined: Wed Apr 08, 2009 8:01 am
Location: Peoples Republic of Westhoughton
Contact:

Post: # 108322Post mickg

We compact the mot on top of the geotextile membrane laid onto the clay then place the lean mix concrete then lay the paving on the laying course
Crystalclear
Driveway and Patio Installer

Call us today
01942 840109
7 days a week 8am till 8pm

Driveways Patios and Paving Specialists
Driveways

seanandruby
Site Admin
Posts: 4713
Joined: Mon Jun 26, 2006 11:01 am
Location: eastbourne

Post: # 108324Post seanandruby

First off you need to check the sub base crushed concrete and any textile if any to see if it's sound, could be you could lay straight on top of that. A geo grid ground reinforcement mesh would normally go straight on top of inferior sub grade if needed to stabilize.
sean

Mikecb1
Posts: 7
Joined: Wed Mar 16, 2016 9:03 am
Location: Southampton

Post: # 108326Post Mikecb1

Oh dear

I started off with 3 different proposals from 3 contractors, but instead of getting strong support for any of them I now seem to have at least 3 more alternative recommendations!

Since the 3 quotations I have are all around the same price, how do I choose???

Or should I get more quotes?

Now very confused.
Docmike

lemoncurd1702
Posts: 712
Joined: Sat Oct 19, 2013 7:56 am
Location: South Wales
Contact:

Post: # 108334Post lemoncurd1702

seanandruby wrote:First off you need to check the sub base crushed concrete and any textile if any to see if it's sound, could be you could lay straight on top of that. A geo grid ground reinforcement mesh would normally go straight on top of inferior sub grade if needed to stabilize.
Is a geo-textile also incorporated somewhere in the sub-base make-up or just the grid.
Cheers
Lemoncurd

lemoncurd1702
Posts: 712
Joined: Sat Oct 19, 2013 7:56 am
Location: South Wales
Contact:

Post: # 108335Post lemoncurd1702

Mikecb1 wrote:Oh dear

I started off with 3 different proposals from 3 contractors, but instead of getting strong support for any of them I now seem to have at least 3 more alternative recommendations!

Since the 3 quotations I have are all around the same price, how do I choose???

Or should I get more quotes?

Now very confused.
I think anymore quotes would confuse the issue more. If they are all Marshalls register and are providing the Marshalls guarantee then you should have no worries.
Cheers
Lemoncurd

mickg
Posts: 2598
Joined: Wed Apr 08, 2009 8:01 am
Location: Peoples Republic of Westhoughton
Contact:

Post: # 108337Post mickg

are they offering you a Marshalls 10 year guarantee ?
Crystalclear
Driveway and Patio Installer

Call us today
01942 840109
7 days a week 8am till 8pm

Driveways Patios and Paving Specialists
Driveways

Post Reply