I have been given the task of forming a procedure for structural concrete testing and reporting..could you fill me in on what the testing variables are...and the acceptance criteria. I know that the slump test has to be passed for the compression test to begin.
Concrete testing
-
- Posts: 373
- Joined: Tue Feb 18, 2003 3:11 pm
- Location: Essex
- Contact:
A good starting point would be the British Standards websiteBritish Standards
Regards
Regards
Simeon Osen
Ronacrete Ltd - http://www.ronacrete.co.uk
Tel: +44 (0) 1279 638 700
Follow us at http://www.twitter.com/Ronacrete
Ronacrete Ltd - http://www.ronacrete.co.uk
Tel: +44 (0) 1279 638 700
Follow us at http://www.twitter.com/Ronacrete
-
- Posts: 25
- Joined: Sun Mar 12, 2006 1:56 pm
- Location: London
dunno about variables. But hire metal cube moulds, fill em up. pay a firm to do the testing, slump test do on site & report findings. That'll give the struct.eng his info.
Also have a look in the spec for the job, that'll say (should say) exactly whats required.
Also have a look in the spec for the job, that'll say (should say) exactly whats required.
The views expressed are entirely my own. Please checkup on my comments. I could be wrong