after wacking down the sub base to a garage drive, how long can you leave it before paving it !

Mick Leek
Posts: 71
Joined: Wed Oct 05, 2005 12:58 pm
Location: Blackburn Lancashire

Post: # 10731Post Mick Leek

Ohhhhh ????? About the time it takes to move the whacker and get the sharp sand down i think..

Tony will clarify..
Nufin tu dis buldin lark

Tony McC
Site Admin
Posts: 8346
Joined: Mon Jul 05, 2004 7:27 pm
Location: Warrington, People's Republic of South Lancashire
Contact:

Post: # 10819Post Tony McC

The sooner it's paved over, the better, but there's no real harm in leaving it open to the elemnts for as long as you like. However, if the top surface becomes contaminated (cat crap, mud, litter, etc.) it's best to scrpae off the top 25mm or so and replace it with fresh sub-base material before you start the paving.