Haha, that would be true if being cold was the reason for getting a cold. Which of course, it's not!digerjones wrote:lutonlagerlout wrote:oops got a stinker of a cold and missed the wink :;):
42 yds of muck dug out by hand in 8 days by 4 men
it would make dave L cry
LOL
LLL
Not a good advert for stripping off if your full of cold.
I've been on the banjo today, and I'm fooked.
Work clothing
-
- Posts: 1000
- Joined: Sun Oct 23, 2011 9:57 am
- Location: southampton, hampshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
the cold has been getting everyone round here lately,I avoided it like the plague but then went and watched Luton with 7000 snivelling sods on saturday
42 yards is 7 skips FB
all barrowed from ramps up through the victorian house and finally up a ramp into the skip
so 1 man on the barrows flat out
2 in the trench 1 on fork 1 on shovel
1 more man (me) on the jackhammer breaking out the old footings
we found a well monday
not the best find
engineer wants to mass fill it with concrete and reinforce around 12 metres of footings with rebar cages
got a pump and 20M3 laid on for 7.30 friday
if all goes to plan in the pub by 12
thing is its not like a normal job,I cant take a day off or 2 blokes cannot get to work
the joys of being your own boss
LLL
42 yards is 7 skips FB
all barrowed from ramps up through the victorian house and finally up a ramp into the skip
so 1 man on the barrows flat out
2 in the trench 1 on fork 1 on shovel
1 more man (me) on the jackhammer breaking out the old footings
we found a well monday
not the best find
engineer wants to mass fill it with concrete and reinforce around 12 metres of footings with rebar cages
got a pump and 20M3 laid on for 7.30 friday
if all goes to plan in the pub by 12
thing is its not like a normal job,I cant take a day off or 2 blokes cannot get to work
the joys of being your own boss
LLL
-
- Posts: 1000
- Joined: Sun Oct 23, 2011 9:57 am
- Location: southampton, hampshire
-
- Posts: 712
- Joined: Sat Oct 19, 2013 7:56 am
- Location: South Wales
- Contact:
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
the fork is a priceless digging tool that takes years to master
you dig with a fork then remove the spoil with a shovel
I bought a new fork the other day and my old one(ten years old) the tines have worn down by around 5 inches through use
obviously we use picks, mattocks,and pins where needed
digging 1200 deep trenchs by hand is an artform
I may not be the best at it, but it never puts me off a job
LLL
you dig with a fork then remove the spoil with a shovel
I bought a new fork the other day and my old one(ten years old) the tines have worn down by around 5 inches through use
obviously we use picks, mattocks,and pins where needed
digging 1200 deep trenchs by hand is an artform
I may not be the best at it, but it never puts me off a job
LLL
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Posts: 1000
- Joined: Sun Oct 23, 2011 9:57 am
- Location: southampton, hampshire
-
- Posts: 712
- Joined: Sat Oct 19, 2013 7:56 am
- Location: South Wales
- Contact:
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
mate we have used 5 tonners when access is these
this particular house is a victorian 3 storey semi (but with no rear access)
first thing the client told me was that 2 other builders came out to quote and both said it couldnt be done without a machine
and due to the location one couldnt be craned over
so I took that as a challenge
we have a pump and 2 volumetrics coming early doors so I am no masochist
we have plyed and used correx throughout the house, but with twists and turns there is no way even a micro would get through
its been a week and a half of hard graft which a digger would have done in a day,but it was all factored in to the price
We have a reputation of *making it happen* and its worked so far
LLL
this particular house is a victorian 3 storey semi (but with no rear access)
first thing the client told me was that 2 other builders came out to quote and both said it couldnt be done without a machine
and due to the location one couldnt be craned over
so I took that as a challenge
we have a pump and 2 volumetrics coming early doors so I am no masochist
we have plyed and used correx throughout the house, but with twists and turns there is no way even a micro would get through
its been a week and a half of hard graft which a digger would have done in a day,but it was all factored in to the price
We have a reputation of *making it happen* and its worked so far
LLL
-
- Posts: 889
- Joined: Fri Jan 18, 2008 9:32 pm
- Location: cheshire
-
- Posts: 712
- Joined: Sat Oct 19, 2013 7:56 am
- Location: South Wales
- Contact:
-
- Posts: 712
- Joined: Sat Oct 19, 2013 7:56 am
- Location: South Wales
- Contact:
How do you set out a run of kerbs that follow a curve without pins.seanandruby wrote:The man on the fork should throw out his share of the spoil to not just loosen it. Fork is handy in certain situations but frowned upon around services and banned on some sites. We aren't allowed to bang pins in on our firm, not even for slabbing, kerbing or setting out ???
Must be a nightmare for the surveyor.
Cheers
Lemoncurd
Lemoncurd
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 1000
- Joined: Sun Oct 23, 2011 9:57 am
- Location: southampton, hampshire