Ok, I've been lurking on this site and picking the brains of better people than me for about 3 years now. Finally I got round to a back garden project of my own this summer.
I think I might have a problem but hopefully I might not.
Yesterday evening I got round to the finishing touches, the pointing. I used VDW 840+ and all was going amazingly well, then the heavens opened and continued to rain on and off to a lesser degree all evening.
My question is; When I get home from work tonight, will it be ok or am I digging it out and buying another 3 1/2 hundred pounds worth? The resin was all in place this morning but not hard but I'm wondering have I had the "glue" washed out of it?
If all is ok I will post a picture of it as I'm well chuffed with it and Tony did the layout and materials list for me, which was worth every penny and without it I would still be there look at the ground.
I think I might have a problem but hopefully I might not.
Yesterday evening I got round to the finishing touches, the pointing. I used VDW 840+ and all was going amazingly well, then the heavens opened and continued to rain on and off to a lesser degree all evening.
My question is; When I get home from work tonight, will it be ok or am I digging it out and buying another 3 1/2 hundred pounds worth? The resin was all in place this morning but not hard but I'm wondering have I had the "glue" washed out of it?
If all is ok I will post a picture of it as I'm well chuffed with it and Tony did the layout and materials list for me, which was worth every penny and without it I would still be there look at the ground.
-
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
- Contact:
Excuse my previous comment. I mistakenly thought it was the 2 part you were referring to. My sales manager just dropped me a line to point out my mistake..cheers Chris
Chris found the following info on the 840+ Data sheet
“Prevent any access to the freshly grouted areas for at least 24 h. Protect
the freshly grouted areas from heavy rain and / or water
flows for at least 24 h. Final opening of the areas to full use
should be after 7 days curing. A physical mortar strength test
can always be carried out before the surfaces go into service.
Prolonged dampness during curing may cause some delay in
hardening or impairment in the ultimate strength.�
So according to the manufacturers advice the heavy rain could cause you an issue.
The excess water will definitely slow down the curing process at the very least. Hopefully it should be ok. the best thing is to leave it for a couple of days and see.
Steve
Chris found the following info on the 840+ Data sheet
“Prevent any access to the freshly grouted areas for at least 24 h. Protect
the freshly grouted areas from heavy rain and / or water
flows for at least 24 h. Final opening of the areas to full use
should be after 7 days curing. A physical mortar strength test
can always be carried out before the surfaces go into service.
Prolonged dampness during curing may cause some delay in
hardening or impairment in the ultimate strength.�
So according to the manufacturers advice the heavy rain could cause you an issue.
The excess water will definitely slow down the curing process at the very least. Hopefully it should be ok. the best thing is to leave it for a couple of days and see.
Steve
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 2
- Joined: Thu Sep 03, 2015 10:54 am
- Location: Locksbottom
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
give it a chance
even though Tony Mc said 6 - 12 hours on this write up of the use of GftK 840+ in cooler weather it can take much longer
Pointing a patio using GftK 840+
even though Tony Mc said 6 - 12 hours on this write up of the use of GftK 840+ in cooler weather it can take much longer
Pointing a patio using GftK 840+
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Site Admin
- Posts: 1854
- Joined: Tue Aug 19, 2008 7:03 pm
- Location: kings lynn norfolk
- Contact:
this time of year upto 24hrs is not uncommon MSH
paving, mini-crusher, mini-digger hire and groundwork
http://mshpaving.co.uk
http://mshpaving.co.uk
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
it should be hard in the morning but wait until tomorrow afternoon for the surface to at least skin over and should be firm to the touch and not soft like sand anymore but can still be soft underneath and needs longer to fully set
in the winter it can take a few days for the surface to skin over but is not detrimental to the final finish which does set hard after a few days
you might find in the morning you might still have surplus grains of the jointing product still on the surface of the flags which don't always show when its still wet or damp, give all the paving a light brush over to remove them
in the winter it can take a few days for the surface to skin over but is not detrimental to the final finish which does set hard after a few days
you might find in the morning you might still have surplus grains of the jointing product still on the surface of the flags which don't always show when its still wet or damp, give all the paving a light brush over to remove them
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways