Different sized joint widths
-
- Posts: 45
- Joined: Sat Nov 15, 2014 4:38 pm
- Location: Uk
Going to lay slabs of differing sizes soon.
Have read the section on different sized joint widths and it seems to be a case of lay some slabs, stand back and look at what you've done and adjust as needed, basically trial and error.
Can anyone offer advice to get it right first time so idont have to keep lifting and adjusting or is it unavoidable?
THANKYOU
Have read the section on different sized joint widths and it seems to be a case of lay some slabs, stand back and look at what you've done and adjust as needed, basically trial and error.
Can anyone offer advice to get it right first time so idont have to keep lifting and adjusting or is it unavoidable?
THANKYOU
Thank-you for helping.
-
- Posts: 521
- Joined: Wed Feb 22, 2012 9:38 pm
It is usually possible to nudge slabs without lifting them as long as you do it asap before the mortar begins to dry or you risk breaking the bond between bedding and flag.
As for the joints just try and think about it as you go. generally speaking the bigger flags will need bigger joints and the smaller ones in particular the 300x300's will need tight joints.
My personal feeling is that if in doubt lay it tight and you can always open it up a fraction with a grinder when your pointing.
Having large 20mm plus joints is a real bug bear of mine and is a clear indication of poor planning and execution.
As for the joints just try and think about it as you go. generally speaking the bigger flags will need bigger joints and the smaller ones in particular the 300x300's will need tight joints.
My personal feeling is that if in doubt lay it tight and you can always open it up a fraction with a grinder when your pointing.
Having large 20mm plus joints is a real bug bear of mine and is a clear indication of poor planning and execution.
-
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
- Contact:
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
technically speaking == I like that phrase
the reality is that unless you have the time to measure each flag there are always the odd rogue one in there thats 15mm under or over
things have improved but no supplier has the time to measure each flag so its up to us
and that is my experience of ALL hand riven indian stone
as neo says better to lay tight and grind out after than have wacking great joints
cheers LLL
the reality is that unless you have the time to measure each flag there are always the odd rogue one in there thats 15mm under or over
things have improved but no supplier has the time to measure each flag so its up to us
and that is my experience of ALL hand riven indian stone
as neo says better to lay tight and grind out after than have wacking great joints
cheers LLL
-
- Posts: 791
- Joined: Wed Feb 05, 2014 7:50 pm
- Location: leicester
-
- Posts: 45
- Joined: Sat Nov 15, 2014 4:38 pm
- Location: Uk
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
you always lay using taught lines set to the finished height of the paving and with falls to disperse surface water, don't lay the paving level
its personal choice but the laying pattern that looks more modern and contemporary is to lay the paving in courses from one side to the other rather than laying using a random laying pattern and to lay with a bond from one row to the next so you don't have any straight lines carrying through
its personal choice but the laying pattern that looks more modern and contemporary is to lay the paving in courses from one side to the other rather than laying using a random laying pattern and to lay with a bond from one row to the next so you don't have any straight lines carrying through
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Posts: 45
- Joined: Sat Nov 15, 2014 4:38 pm
- Location: Uk
-
- Posts: 952
- Joined: Mon Oct 30, 2006 8:24 pm
- Location: Bournemouth, Dorset
no its not, there will be full width joints, see about half way down pg 193 of the "recent work" thread in "site works" topic.Jimmy Conway wrote:... so there won't be any lines of pointing running continually through the full length or width of patio. Think that's same method you suggested...
as diy'er who has laid his own patio, with the full random patio, I should have done it as stated/shown !!
-
- Posts: 2598
- Joined: Wed Apr 08, 2009 8:01 am
- Location: Peoples Republic of Westhoughton
- Contact:
this is laid in courses, the alternative is a random laying pattern
patio laid in courses
patio laid random sizes
patio laid in courses
patio laid random sizes
Crystalclear
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
Driveway and Patio Installer
Call us today
01942 840109
7 days a week 8am till 8pm
Driveways Patios and Paving Specialists
Driveways
-
- Posts: 45
- Joined: Sat Nov 15, 2014 4:38 pm
- Location: Uk
-
- Posts: 2199
- Joined: Mon May 10, 2010 1:07 pm
- Location: Surrey
- Contact:
We've got laying patterns on the product pages. If you look in the left hand navigation you will see a section called paying patternsr896neo wrote:Unfortunately here in NI we are only just getting most stone available calibrated, having sizes compensated to allow for joints is still a while off....
Do you supply a laying pattern then to go with that steve?
Laying patterns