When laying reclaimed bricks for a pathway, top/bed upwards, what would be the best method of doing so?
Actually bedding them on a sharp sand/ cement mix? Or laying them as you would block paving, then wacking down etc?
Laying reclaimed bricks
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
firstly are they suitable chris?
house bricks are apt to fail in the ground
the way I have done it (but not recently)
dig out the ground
lay 100mm hardcore or type 1 and wack
screed approximately 8m by 1 m of 6:1 grit sand :cement dryish mix
lay the bricks on this screed with a perp on two sides but no bed
every metre or so run over with a piece of 4 by 2 and a mallet tapping down the odd high brick
joint up as necessary as the mortar dries out
the main point is that you are using jointing the bricks as you go rather than having to come back later
IIRC me and my mate did a 12m Path in 2 days dig out etc and lay
LLL
house bricks are apt to fail in the ground
the way I have done it (but not recently)
dig out the ground
lay 100mm hardcore or type 1 and wack
screed approximately 8m by 1 m of 6:1 grit sand :cement dryish mix
lay the bricks on this screed with a perp on two sides but no bed
every metre or so run over with a piece of 4 by 2 and a mallet tapping down the odd high brick
joint up as necessary as the mortar dries out
the main point is that you are using jointing the bricks as you go rather than having to come back later
IIRC me and my mate did a 12m Path in 2 days dig out etc and lay
LLL
-
- Site Admin
- Posts: 4713
- Joined: Mon Jun 26, 2006 11:01 am
- Location: eastbourne
lutonlagerlout wrote:firstly are they suitable chris?
house bricks are apt to fail in the ground
the way I have done it (but not recently)
dig out the ground
lay 100mm hardcore or type 1 and wack
screed approximately 8m by 1 m of 6:1 grit sand :cement dryish mix
lay the bricks on this screed with a perp on two sides but no bed
every metre or so run over with a piece of 4 by 2 and a mallet tapping down the odd high brick
joint up as necessary as the mortar dries out
the main point is that you are using jointing the bricks as you go rather than having to come back later
IIRC me and my mate did a 12m Path in 2 days dig out etc and lay
LLL
The more i look at this quote the more confused i get. The absence of punctuation also adds to the confusion. Thought you had been taking lessons off Cookie, or been on the lout gear :;): No insult intended .
lay the bricks on this screed with a perp on two sides but no bed ???
sean
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire