New 200mm pink granite drive
-
- Posts: 5
- Joined: Tue May 06, 2014 2:30 pm
- Location: Hertfordshire
Good afternoon gents. I am new to this board and new to any type of landscaping.
I have nearly completed a project that has seen me remove an area of 12m x 5m of concrete and turn it into a landscaped garden with drive. It not been plain sailing but has been a learning curve and fun at the same time.
I have an issue though I need help with. The driveway consists of an edging of block paving all round the edge and a herringbone block path running up the centre. Either side of this, the wife decided she wanted 20mm pink granite to fill the two remaining car spaces.
This granite seems to get stuck to both our cars rear wheels and drops onto the path. Is there a way, without restarting, to bond this granite? Even if it is just the first few feet.
Many thanks in advance for your help
Ray
I have nearly completed a project that has seen me remove an area of 12m x 5m of concrete and turn it into a landscaped garden with drive. It not been plain sailing but has been a learning curve and fun at the same time.
I have an issue though I need help with. The driveway consists of an edging of block paving all round the edge and a herringbone block path running up the centre. Either side of this, the wife decided she wanted 20mm pink granite to fill the two remaining car spaces.
This granite seems to get stuck to both our cars rear wheels and drops onto the path. Is there a way, without restarting, to bond this granite? Even if it is just the first few feet.
Many thanks in advance for your help
Ray
-
- Posts: 5
- Joined: Tue May 06, 2014 2:30 pm
- Location: Hertfordshire
Hi mate and thanks for the reply. That was my initial thought also, but looking into it, it does not seem something that can be carried out in retrospect. Seems like I would have to remove the 3 ton of stones, remove some of the compacted sub base then start laying a concrete base.
That said, if there was a polyurethane resin or epoxy based resin that I could maybe spray/pour on the first few feet that would be great
That said, if there was a polyurethane resin or epoxy based resin that I could maybe spray/pour on the first few feet that would be great
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Posts: 5
- Joined: Tue May 06, 2014 2:30 pm
- Location: Hertfordshire
-
- Site Admin
- Posts: 15184
- Joined: Fri Aug 04, 2006 12:20 am
- Location: bedfordshire
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Posts: 5
- Joined: Tue May 06, 2014 2:30 pm
- Location: Hertfordshire
-
- Posts: 5
- Joined: Tue May 06, 2014 2:30 pm
- Location: Hertfordshire
Do you know the name of the resin Tony at all mate?Tony McC wrote:There actually *is* a pour-over resin which you could use, but you better have bloody deep pockets because the last time I bought any, at trade prices with a load of other incentivising discounts, it was costing me 35 quid per litre!
-
- Site Admin
- Posts: 8346
- Joined: Mon Jul 05, 2004 7:27 pm
- Location: Warrington, People's Republic of South Lancashire
- Contact:
-
- Posts: 6
- Joined: Mon Apr 07, 2014 10:57 am
- Location: Southend
Simple fix that would not be perfect but that is worth considering.
Use a ground reinforcement mesh under the first 3 foot, you will need to dig down, fill and compact with type 1 and then relay your stones gravel bound over that.
http://www.cellgraveldriveways.co.uk/
My concerns... only doing the first three foot your car tyres are likely to still pick up the gravel and it will still drop where you don't want it.
You need to make sure the stones are dry (properly dry!) before resin bonding them.
It won't look right and you will be annoyed you didn't just redo it all properly.
You WILL get movement around the resin bonded area so you will end up with gaps between any hard standing and the resin.
20mm stones are really too big for resin bonded for which the maximum suggested size is 10mm and typically 6mm!
So that's how to do it and what you will get if you want an easy life
Personally I think you should put up with the gravel for now OR place ground support mesh just to reduce stone movement and then do a proper resin bound job with the correct size stones in a few years
Use a ground reinforcement mesh under the first 3 foot, you will need to dig down, fill and compact with type 1 and then relay your stones gravel bound over that.
http://www.cellgraveldriveways.co.uk/
My concerns... only doing the first three foot your car tyres are likely to still pick up the gravel and it will still drop where you don't want it.
You need to make sure the stones are dry (properly dry!) before resin bonding them.
It won't look right and you will be annoyed you didn't just redo it all properly.
You WILL get movement around the resin bonded area so you will end up with gaps between any hard standing and the resin.
20mm stones are really too big for resin bonded for which the maximum suggested size is 10mm and typically 6mm!
So that's how to do it and what you will get if you want an easy life
Personally I think you should put up with the gravel for now OR place ground support mesh just to reduce stone movement and then do a proper resin bound job with the correct size stones in a few years
-